Well Testing - Wellpoint Dewatering SystemsPump tests are conducted for two main purposes: 1) To test the hydraulic parameters of an aquifer. This may relate to a dewatering plan for future construction or aquifer parameters for a future tailings pond or dam site. 2) To test the performance characteristics of a water well. This will determine the yield of the well and provide information to properly size the pump. 

Groundwater Control Systems offers a complete package for pump tests including: 

  • Pump install and removal 
  • Pumps from 5 to 800 usgpm 
  • Variable frequency drives 
  • Digital read out flow meters from 0.75 to 2500 usgpm 
  • Gensets and light towers 
  • Surface tanks and discharge up to 10 km 
  • Insulating and heating of discharge 
  • Water level tapes and dataloggers 
  • 24 hour supervision and data collection